Call us on 01284 729008 Email us at info@kmsscaffolding.co.uk KMS Roofing (opens in a new tab)

Scaffolding In Winter: What Considerations Must You Make?

Posted by KMS Group

Accredited & certified

  • CHAS Accredited Contractor
  • CISRS Construction Industry Scaffolders Record Scheme
  • CITB
  • Suffolk County Council
  • Scaffolding Association

Construction and repair tasks are needed throughout the year, as is the scaffolding necessary to do them safely. However, adverse weather, sudden changes in conditions, and less daylight mean that you need to account for some additional risks in winter compared to summer.

Ensuring that scaffolding is safe is a legal requirement all year round, and mitigating the risks of working at height does not change irrespective of the season, but there are some challenges that come from planning scaffolding around the winter months.

To understand what you can do to keep yourself safe on scaffolding in winter, here are some of the main additional risks found when working at height during the winter, as well as what you can do to mitigate them.

How Does Winter Weather Affect Scaffolding?

The biggest challenge that emerges during the winter months is caused by the weather, which can make traction far more treacherous than would be found during dry weather.

Whilst rain affects British construction sites during most of the year, heavier rain showers, ice and snow can all make access points for scaffolding and the boards themselves far more slippery.

Alongside this, strong winds can also cause potential problems, particularly if you have netting attached to the scaffolding that could be caught by the wind and affect the loading it can take.

The exact nature of the dangers will depend on how exposed the scaffold and its surfaces are, 

but these should all be considered on a day-to-day planning basis. If the weather is treacherous or is forecast to get worse, mitigations must be put into place to protect anyone on or near it. 

How Do Changeable Conditions Affect Scaffolding?

A particularly complex aspect of winter weather is the extent to which weather conditions will change. The weather around Cambridge is particularly changeable because of where the UK as a whole is located, being on an island and between several major air masses.

However, whilst changeable weather in winter is merely frustrating on the ground, it can be potentially dangerous when on a scaffold, and it is essential that a competent person is available to inspect it should there be significant adverse weather to potentially alter its safety.

Construction projects should be clear about what constitutes adverse weather, what protocols need to be in place and the situations where work needs to be paused and scaffolding reinspected.

Do Shorter Days Affect The Safety Of Scaffolding?

Another aspect of winter weather that is not always considered is that winter brings with it significantly fewer daylight hours. Days are half as long on average on the Winter Solstice (the shortest day of the year) compared to the Summer Solstice (the longest day of the year).

This can have significant effects on visibility if work needs to take place in the early morning or late afternoon, and requires sufficient lighting to be provided to ensure that workers can use the scaffold safely without any risks of injury.

Typically, this means setting up a loop of lights along the scaffolding of a sufficient brightness to make all paths and access points clearly visible.